As part of a PEE(Programable / Electrical / Electronics), the analysis of dependability of a system must fit into a risk management overall.
Risk control and dependability
Lambda Mu16 – The New Challenges of Risk Control
Two years after the Lambda Mu 15, the Institute for risk control (LMdR) has organized the sixteenth edition of its famous congress, and has proposed the theme of “New Challenges” which were covered by industrial, investors, engineers, consultants, and specialists whom exposed to the problem of risk Control and Operational Safety.
ClearSy as a recognized actor in the realisation and the study of operational safety systems must be kept informed and learn the what are the new challenges for the next century.
Categories
WP Cumulus Flash tag cloud by Roy Tanck and Luke Morton requires Flash Player 9 or better.